Long Term Intervention Monitoring Project Murrumbidgee System Selected Area Project Progress Report #18: Report period: 1 October 2018 – 31 December 2018

Research output: Book/ReportCommissioned report

Abstract

This quarterly report outlines key activities undertaken and preliminary outcomes identified during monitoring of ecosystem responses to the use of Commonwealth environmental water in the Murrumbidgee Catchment undertaken as part of the Murrumbidgee Long Term Intervention Monitoring (LTIM) Project between 1 October and 31 December 2018. Monitoring includes assessment of ecological outcomes in the Murrumbidgee River and connected wetlands through the mid-Murrumbidgee and Lowbidgee floodplain wetlands as outlined in the Murrumbidgee Monitoring and Evaluation Plan.

All 4 wetland sites monitored in Nimmie-Caria, and three of the South Redbank sites held water at the time of the November surveys. Three of the mid-Murrumbidgee sites were dry, and Yarradda Lagoon was refilling after drying down.
Original languageEnglish
Place of PublicationCanberra
PublisherCommonwealth of Australia
Commissioning bodyCommonwealth Environmental Water Office
Number of pages10
Volume18
Publication statusPublished - 31 Dec 2018

Fingerprint Dive into the research topics of 'Long Term Intervention Monitoring Project Murrumbidgee System Selected Area Project Progress Report #18: Report period: 1 October 2018 – 31 December 2018'. Together they form a unique fingerprint.

Cite this