N2 - This fixed term project was agreed on 18 January 2020 to create benchmark vegetation transects in Murrumbidgee wetlands using Commonwealth and NSW environmental water not currently monitored under the Murrumbidgee Monitoring Evaluation and Research (MER) Program. The aim was to set up vegetation transects, complete vegetation surveys using accepted local methods and do tree health assessments. These transects could then be surveyed numerous times in the future to enable comparison of aquatic vegetation communities over time, as a response to continued watering.
AB - This fixed term project was agreed on 18 January 2020 to create benchmark vegetation transects in Murrumbidgee wetlands using Commonwealth and NSW environmental water not currently monitored under the Murrumbidgee Monitoring Evaluation and Research (MER) Program. The aim was to set up vegetation transects, complete vegetation surveys using accepted local methods and do tree health assessments. These transects could then be surveyed numerous times in the future to enable comparison of aquatic vegetation communities over time, as a response to continued watering.
UR - https://www.csu.edu.au/research/ilws/research/environmental-water/murrumbidgee-mer/reports/Murrumbidgee-Vegetation-Benchmarking-Project-Final-Report_22112021.pdf
M3 - Commissioned report (public)
BT - Murrumbidgee Monitoring Evaluation and Research program
PB - Commonwealth Environmental Water Office
CY - Canberra, ACT
ER -